Traceability

Who changed the figure, and when

A valuation is challenged long after the person who prepared it has moved on. The question is never what the number was. It is how it was arrived at, and by whom.

30 days free · No card required · Every feature on every plan

Recorded automatically, editable by nobody

An audit trail you have to remember to write is not an audit trail. QScope records the change as it happens, including changes made by other surveyors in your practice.

Nothing in the interface can alter or delete an entry. That is the whole point: a record that can be quietly amended is worthless as evidence.

  • Certificates created, issued, changed in status or deleted
  • Variations raised, approved, rejected or removed
  • Contract sum, retention rate and key dates changed, with old and new value
  • Client and subcontractor access granted, changed or revoked
Audit trail
11 Essex Road
DetailUserType
Certificate No. 04: Draft to Issued, net £14,031.00AdrianCert
Variation VO-01: Pending to Approved, £1,000.00AdrianVO
Client access granted to j.smith@buildco.co.ukAdrianAccess
Retention rate changed from 3% to 5%M. LewisSettings

The reason each surveyor needs their own login

A shared practice login makes every entry say the same name, which is the same as recording nothing. It is also the fastest way to make an audit trail useless in front of an adjudicator.

QScope prices per surveyor rather than per project partly so that giving everyone their own login never costs you a project.

  • Each surveyor signs in as themselves, on every plan
  • Guests are free and their actions are recorded too
  • A live activity feed shows what changed since you last looked
  • Export the whole trail to CSV for a bundle or a client file
Activity
What changed while you were out
Interim certificate PC-04 issued, £14,031.002 h ago
Variation VO-03 created, £3,240.005 h ago
Subcontractor valuation 03 prepared1 d ago
Unread on this project3

The record the trail is protecting

An audit trail proves who changed a figure. The project record is the thing being changed: the drawings, photographs and contracts the valuation rests on.

Held on the same project, every file carries its own trail entry, so a superseded drawing can be shown as the version that was current on the day the work was valued.

  • Drawings versioned as they are superseded
  • Photographs tied to the project and the date they were taken
  • Contracts and correspondence filed against the job
  • Every change to a file recorded in the audit trail
Project record
Files on 11 Essex Road
DocumentStatus
Contract, JCT SBC 2016, signedCurrent
Drawing A-102 rev C, gable elevationCurrent
Drawing A-102 rev BSuperseded
Site photographs, week 1418 files

The figures the trail is recording

Most audit entries are about money. A certificate moving from draft to issued, a variation approved, a retention rate changed: each one moves a figure the client will eventually see.

The valuation is where those figures are set, and every change to it lands in the trail with the old value and the new.

  • Certificates created, issued or changed in status recorded
  • The net figure held on the entry, £14,031 on PC-04
  • Retention rate changes recorded with old and new value
  • Export the certificate and its trail together for a bundle
Client Valuations
Interim certificate PC-04
Gross this period£24,180.00
Less retention at 5%(£1,209.00)
Previously certified£70,084.00
Net due this certificate£14,031.00

Every change to a variation, on the record

A variation is challenged more often than anything else in a final account. What is asked for is not the amount but who instructed it, under which clause, and when it was approved.

QScope records each variation as it is raised, approved, rejected or removed, so the history of the change survives the people who made it.

  • Variations raised, approved, rejected or removed recorded
  • Basis of valuation and contract clause held on the record
  • Approved value recorded with who instructed it
  • Nothing in the interface can amend the entry
Variations
VO-01 Additional window to gable
Basis of valuationContract rates
Contract clauseJCT 5.6.1
Instructed byR. Hall, architect
StatusApproved
Approved value£1,000.00
Questions

What surveyors ask before they start

Can I delete an entry?

No, and that is deliberate. Nothing in QScope can amend or remove an audit entry. A record that the holder can edit proves nothing, which defeats the reason for keeping one.

Does it record settings changes as well as money?

Yes. Contract sum, retention rate, contract form and key dates are recorded with the old and the new value, because a quietly changed retention rate moves every certificate after it.

Can I export it?

Yes, to CSV, per project. It opens in Excel with a byte order mark so names with accents are not mangled, which matters when the file goes into a bundle.

Is this required by RICS?

RICS does not mandate a particular system, but the Black Book expects a quantity surveyor to be able to show how a valuation was reached. An automatic record is the cheapest way to be able to answer that a year later.